Bonding Primer = Overlay Success

When resurfacing a concrete floor, applying a proper bonding primer is not optional — it's essential. Primers improve adhesion, lock overlays onto the slab, control moisture transmission, and prevent failures like peeling, bubbling, or delamination. Skipping this critical step leads to poor performance and expensive callbacks. In this guide, we'll show you exactly how to apply a concrete bonding primer the right way to guarantee strong, long-lasting results.

Why Priming Before Resurfacing Matters:

  • Creates chemical and mechanical bonds between slab and overlay
  • Seals surface pores to control water absorption
  • Reduces outgassing and pinholes in coatings
  • Improves flexibility and crack resistance in overlays

✔ Step-by-Step: How to Apply a Concrete Bonding Primer

  1. 1

    Select the Correct Primer for Your Overlay System

    Not all primers are the same. Some overlays require epoxy primers, others use polymer-modified cementitious primers, and some accept acrylic primers. Always match your bonding primer to your overlay system specifications. Using the wrong primer can cause bond failures, incompatibility reactions, or reduce overlay flexibility. Consult the manufacturer and verify coverage rates, mixing instructions, and cure times before starting.

  2. 2

    Prepare the Concrete Surface Properly

    The slab must be clean, open-textured, and dust-free before priming. Grind, shot blast, or scarify as needed to achieve a CSP 2–3 profile. Vacuum all dust thoroughly. If moisture levels are high, use a vapor-barrier primer where required. The cleaner and rougher the surface, the better the bond. Primers must penetrate pores and grip mechanical textures — they cannot stick properly to smooth, dusty, or contaminated slabs.

  3. 3

    Mix the Primer According to Instructions

    Many primers come as two-part epoxies or require dilution with water for better penetration. Always mix exactly according to the product datasheet. Improper mixing ratios can weaken performance or cause primers not to cure fully. Use clean buckets, slow-speed drills with paddle mixers, and avoid whipping air into the mix. Mix only as much material as can be applied during the primer's working time (pot life).

  4. 4

    Apply the Primer Evenly and Consistently

    Pour the primer directly onto the floor in ribbons. Spread using soft foam rollers, squeegees, or low-nap microfiber rollers depending on viscosity. Roll or spread the primer thinly and uniformly — avoid puddles or dry spots. The goal is complete coverage, pushing primer into pores and mechanical textures. Missed areas or oversaturated zones can create bonding weaknesses later when the overlay is applied.

  5. 5

    Allow Primer to Cure Properly Before Overlay

    Follow the manufacturer’s guidelines for primer curing times. Some primers must remain slightly tacky for overlay installation; others require full cure to a dry film before proceeding. Humidity, temperature, and airflow all affect cure times. Never rush this stage. Premature overlay application can trap moisture or cause bond failures. Always verify primer readiness with thumbprint tests if needed.

  6. 6

    Apply a Second Primer Coat if Required

    Some very porous or rough slabs may require two primer coats to fully seal the surface and achieve optimal adhesion. Apply the second coat perpendicular to the first, and allow proper cure times between coats. Always refer to your overlay manufacturer’s recommendations. Skipping a second coat where needed leads to poor topcoat leveling and increased risk of bubbling from substrate outgassing.

  7. 7

    Proceed with Overlay Application Promptly

    Once the primer is properly cured or tacky (depending on system), begin overlay application immediately. Delaying can cause contamination from dust or airborne debris, reducing bond strength. Plan your primer and overlay application carefully so there’s minimal downtime. A clean, primed surface dramatically improves the mechanical and chemical adhesion needed for high-performance, durable concrete resurfacing projects.

Is primer always needed before resurfacing concrete?
Yes — unless your overlay system specifically states otherwise, primer is critical for creating strong chemical and mechanical bonds between the slab and resurfacing material.
Can I use any primer or does it have to match my overlay?
You must match your primer to your overlay system. Using an incompatible primer can cause adhesion failures, chemical reactions, or weakening of the overlay.
What happens if you apply overlay too early over wet primer?
Applying overlay over wet primer (when not specified) can trap moisture, cause bubbles, prevent bonding, or even delaminate the system. Always allow correct cure times.

Ready to Hand It Over to the Pros?

If you'd rather skip the stress and get a flawless concrete floor polished by professionals, we’ve got you covered. From precision prep to polished perfection — we handle it all.

Get in touch today for a no-obligation quote on polished concrete flooring:

Or fill in the form below and we’ll get back to you with honest advice and a competitive quote.